Project description
The project involves the construction of an enterprise for bottling bottled natural mineral water and natural (artesian) drinking water of the highest category with a total design capacity of 115.0 million liters per year. The design work on the «Project» stage has been completed. A positive conclusion of the state expertise and a permit for the construction of the facility were received. An exploration and production well has been installed and equipped on the site, a well above-ground structure has been built. Installation work has been carried out on the technical connection of a power line with a capacity of 100 kW. There is a water drainage line with an absorbing well with a length of 60 m. The entrance is equipped with a lightweight coating.