Active recreation park with wave lagoon and artificial wave generator "Activiti wavepark"

Description

A water lagoon with an artificial wave generator is being built in the park, no worse than ocean waves, and the entire beach infrastructure for recreation is being equipped. The wave infrastructure in the lagoon is used for training athletes, for teaching children and everyone in the surf school. The common complex is equipped with sports facilities for children and adults, a health and recreation boarding house with SPA treatments, a hotel for athletes, cafes, shops, a chillout and a music venue.

Publication date: 21.12.2021 Last updated: 22.05.2026

Share

Active recreation park with wave lagoon and artificial wave generator "Activiti wavepark"

Industry

Строительство

Project type

New construction / launch of new production

Project budget

2,3 bln

detailed project information

Description

About the project

A water lagoon with an artificial wave generator is being built in the park, no worse than ocean waves, and the entire beach infrastructure for recreation is being equipped. The wave infrastructure in the lagoon is used for training athletes, for teaching children and everyone in the surf school. The common complex is equipped with sports facilities for children and adults, a health and recreation boarding house with SPA treatments, a hotel for athletes, cafes, shops, a chillout and a music venue.

Description of project services or products

There are no such facilities in Russia and the near abroad, but it is very popular due to the policy of a healthy lifestyle and recreation in the Russian Federation, as well as in connection with the popularization of surfing as entertainment and lifestyle. The complex is year-round and relevant around the clock. The territory within a radius of 50 km from the complex will be promising for development, while 8 similar facilities have already been built in the world and 15 are in the process.
According to the results of the negotiations, the producers of the lagoon and wave generation technology are ready to start work if there is a land plot, we are in the stage of negotiations with interested investors, there is an experienced team of operators and trainers. There is a team of like-minded people who are ready to become a project generator. The experience of operating such complexes abroad has been studied, an already built facility in North Wales has been tested.

Project company: Межрегиональная некоммерческая общественная организация «Правильные люди»

Investment indicators

Project budget

2,3 bln ₽

IRR

15,5%

NPV

530 mln ₽

PBP

60 months

Equity share in the project budget

22%

Investments in the project

1,8 bln ₽

total investment volume

Regional support measures

General support measures

Льгота по налогу на прибыль организации

details

Льгота по налогу на имущество организации

details