INVESTMENT PORTAL
OF RUSSIAN REGIONS
0%
LOADING DATA

Thermal SPA complex with an all-weather outdoor pool

Description

A year-round spa complex with an outdoor heated pool will be located within walking distance from the ski lifts of the existing “Belaya Gora” ski resort. In the territory of the SPA complex with a total area of 4 969 m² there will be an outdoor and indoor all-season pool, a spa and massage area, a bath complex, a phyto-bar, a café with veranda, 20 guest rooms. Large companies and those who want privacy will be able to find accommodation in stand-alone cottages. Additional functions: Cafes, places for accommodation in the SPA complex, individual cottages for accommodation of 4-6 people. Number of rooms in the main building: 20 (average room size is 23 m²) Total area: 4 969 m² Implementation schedule: 2021–2022 Total investment: 242.7 million roubles The location of the thermal SPA complex will allow its guests to use the infrastructure of GLK (ski resort) “Gora Belaya”: ski slopes, trails for walking and hiking, excursions, museums, attractions of nearby villages. The planned location of the thermal SPA complex will be within the boundaries of the expanding tourist and recreational cluster “Gora Belaya” (the project is managed by ANO TRK “Gora Belaya”) Conducive environment for implementation: - The thermal SPA complex will become an independent object of attraction for tourists, regardless of the season. - The format of the all-weather thermal spa complex successfully operates at similar Russian and foreign resorts. - The location of the facility will be in one of the most picturesque places in the Urals: it is part of the “Veselye Gory (Merry Mountains)" mountain range. - Significant reduction in investor costs –– The management company will defray expenses for laying utility networks and building roads to the boundaries of the site, improve the common areas of the resort, provide an opportunity to use tax benefits during the operation of the facility, and help to attract soft term financing

Publication date: 23.04.2020 Last updated: 25.05.2021

Share

Thermal SPA complex with an all-weather outdoor pool

Industry

Деятельность гостиниц, предприятий общественного питания, развлечений и досуга, туризм

Project type

Rendering of services

Project budget

243 mln

detailed project information

Description

About the project

A year-round spa complex with an outdoor heated pool will be located within walking distance from the ski lifts of the existing “Belaya Gora” ski resort.

In the territory of the SPA complex with a total area of 4 969 m² there will be an outdoor and indoor all-season pool, a spa and massage area, a bath complex, a phyto-bar, a café with veranda, 20 guest rooms. Large companies and those who want privacy will be able to find accommodation in stand-alone cottages.

Additional functions:
Cafes, places for accommodation in the SPA complex, individual cottages for accommodation of 4-6 people.
Number of rooms in the main building: 20 (average room size is 23 m²)
Total area: 4 969 m²
Implementation schedule: 2021–2022
Total investment: 242.7 million roubles
The location of the thermal SPA complex will allow its guests to use the infrastructure of GLK (ski resort) “Gora Belaya”: ski slopes, trails for walking and hiking, excursions, museums, attractions of nearby villages.
The planned location of the thermal SPA complex will be within the boundaries of the expanding tourist and recreational cluster “Gora Belaya” (the project is managed by ANO TRK “Gora Belaya”)
Conducive environment for implementation:
- The thermal SPA complex will become an independent object of attraction for tourists, regardless of the season.
- The format of the all-weather thermal spa complex successfully operates at similar Russian and foreign resorts.
- The location of the facility will be in one of the most picturesque places in the Urals: it is part of the “Veselye Gory (Merry Mountains)" mountain range.
- Significant reduction in investor costs –– The management company will defray expenses for laying utility networks and building roads to the boundaries of the site, improve the common areas of the resort, provide an opportunity to use tax benefits during the operation of the facility, and help to attract soft term financing

Description of project services or products

SPA area:
- Outdoor warm pool
- Indoor pool with jacuzzi and massages
- Bath complex: hamam, Finnish sauna, Russian banya, hay bath, salt bath
- Massages and pediluvio
- Phyto-bar

Room Categories:
- 20 rooms of formats Economy, Standard, Family (family suit)
- 5 stand-alone cottages with kitchen and sauna for 5-6 people

Food and Beverage Service:
- Cafe with 50 seats

Contacts of the regional development institute

Ministry of Investment and Development of the Sverdlovsk region, Mikheicheva Ekaterina Valerevna, 8(343) 312-00-31 доб. 426, e.miheicheva@egov66.ru

Project company: АНО ТРК «Гора Белая» (website)

Investment indicators

Project budget

243 mln ₽

IRR

25%

PBP

C_MONTHS

Government support

The project is supervised by the Ministry of Investment and Development of Sverdlovsk Region. The ANO TRK “Gora Belaya” managing company has signed an agreement on cooperation in the area of tourism and recreation cluster activities in compliance with Art. 26 of Regional Law No. 51-OZ, dated December 31, 1999, "On tourism and tourist activities in Sverdlovsk region."

Investments in the project

243 mln ₽

total investment volume

Regional support measures

General support measures

Налоговые льготы для резидентов территорий опережающего социально-экономического развития (ТОСЭР) г. Новоуральск, г. Лесной и г.Краснотуринск

details

Гранты на развитие материально-технической базы

details

Гранты «Агростартап»

details

Грант Фонда содействия инновациям по программе «Коммерциализация»

details

Субсидии на возмещение части прямых понесенных затрат на создание и (или) модернизацию объектов агропромышленного комплекса (создание и (или) модернизация хранилищ)

details

Субсидии на возмещение части затрат сельскохозяйственных потребительских кооперативов в Свердловской области

details

Субсидии на реализацию мероприятий в сфере обращения с твердыми коммунальными отходами

details

Займы Свердловского венчурного фонда

details

Заемное финансирование проектов, реализуемых по приоритетным направлениям российской промышленности (программа "Проекты развития")

details

Заемное финансирование проектов, реализуемых по приоритетным направлениям российской промышленности (программа "Комплектующие изделия")

details

Поручительство по договорам банковского кредитования Свердловского областного фонда поддержки предпринимательства

details

Налоговые льготы для резидентов особой экономической зоны «Титановая долина»

details

Налоговые льготы для инвестора при реализации приоритетных инвестиционных проектов (ПИП) на территории Свердловской области

details

Инвестиционный налоговый кредит на территории Свердловской области

details

Предоставление земельного участка инвестору без процедуры проведения торгов

details